Recent refurbishment works by S.Tysoe with floor and wall damage.  
Our client contacted us with a need to install replacement flooring and wall protection in their two chillers. The flooring was damaged and posed a health and safety risk to employees when accessing the chiller. Several smaller repairs had previously been attempted by another contractor which had resulted in an uneven floor surface making the use of trolleys and cages difficult. We replaced the flooring with heavy duty galvanised floor plates.  
 
The insulated panel walls in both chillers were damaged. To prevent any further damage we installed 5 bar aluminium wall plates to cover the full internal perimeter, this was then finished off with aluminium angle.  
 
The completed works have given the client chillers which are operationally safer to use for employees and ensured that the walls are protected from any further damage. Both chillers were handed over within a short timescale of 3 days and delivered within budget. 
Chiller coldroom damaged floor
 
Chiller coldroom damaged floor
 
Chiller coldroom floor and wall refurbishment
 
Chiller coldroom floor and wall refurbishment
 